ELECTRICAL QC WORKS @ RELATED : QA/QC Test inspections

QA/QC Test inspections

Civil and buildings (contract No… Project No…….
The Employer The Engineer  Main Contractor Sub Contractor 
Logo of Employer  Logo of Engineer  Logo of Contractor  Logo of Subcontractor
Inspections & Test plan






Title /Descriptions Block Works  Date …
Rev……
Unit Area : Discipline : Block Work  Inspection  Date :
Time :
Activity
no.
Activity /Description Inspections Test
 Requirements 
Reference Documentation Inspection/Verification Verifying Documents/
Demonstrated Evidence
Report Checklist
(Reference Number )
Test or Inspection
Performed 
Stage /
Frequency
Code/Space/
etc
Acceptance
 Criteria 
Contractor  Eng. Employer 
1 Approval /Permits /Preliminaries
1.1    Preparation of
1. ITP
2.Method Statement 
Approval Prior to
Start of
work
Specification
 Section Number 
Code 1/2 E R H Approved
SubmittingElectrical .com 
2 material Inspections (Delivery on Site )
2.1 Material's Visual Material
arrival on site 
Specification
 Section Number 
E W S Material Receiving
Inspection Report
(MRIR) 
2.2 Accessories  Visual Material
arrival on site 
Specification Section
Number
As per approval materiel
Submitting code 1/2
E W S Material Receiving
Inspection Report
(MRIR) 
Work Process
3.1 Prior to start block work 
3.1.1 Mock Up Visual One wall panel
with all required
accessories used 
Approval Drawing
Specification section
Number 
1.As per approval shop drawing 2. All required accessories
included in the mock up
E H W IRF Method
Statement checklist
checklist number 
3.2 Blocks laying installation
3.2.1 Setting out &
Preparation 
Visual Prior to laying
of every first
course
Approved shop
drawing for
block work
layout 
As per approved
survey layout Satisfactions
condition
E W W Checklist
checklist number 