ELECTRICAL QC WORKS @ RELATED : Shop Drawing Submittal

Shop Drawing Submittal


The Employer logo
The Engineer logo
The Contractor  logo
Project:
From:
To: ##### Consult
Shop Drawing Submittal
 Ref. No. :
SD / ###  -  Rev. / 00
Date :

Required By :

Division / section :

Shop Drawing(s) Number, Revision & Title :
Originator of Submittal :
Contractor's Statement: We certify that the drawing(s) submitted herewith has(have) been reviewed in detail and in compliance with the Contract drawings and specifications except as otherwise stated here above.
Contractor's PM :
Signature & Date





Received By ##### Consult :
Signature & Date


Review Status
 









Engineer's Representative Comments:











Engineer's Representative :
Signature & Date

Received by Contractor :
Signature & Date

Corrections or comments made relative to submittals during this review do not relieve the Contractor from compliance with the Contract requirements and specifications. This check is only for review of general conformance with the design concept of the project and general compliance with the information given in the Contract documents. The Contractor is responsible for confirming and correlating all quantities and dimensions, selecting fabrication processes and techniques of construction, coordinating his Work with that of other trades and performing his Work in a safe and satisfactory manner.

No comments:

www.electricalqcblogspot.com